The U.S. Army Corps of Engineers made the determination to fund and undertake an 18-month disposition study on the Upper Lock, Lower Lock, and Lock 1, to begin Spring 2018. The study was later paused after the 2018 Water Resources Development Act directed the Corps to expedite a study looking exclusively at the Upper Lock.